Been away awhile but ever lurking.... looks like I can no longer ignore the after effects of a job not well done 10yrs or more ago. (not by me) Rust was cut out, some patches were tacked in then filled with bondo, and behind it all was expanding foam, lots of it! She has been moved to the side yard and I am picking at the cancer. I am thinking the entire seam needs to go. I don't see how I could recreate the a-joing area with rust blistering everywhere + I am not sure how the metal originally laid down. Are there any reasons I should not cut out the whole seam and patch in solid steel? then spot/plug weld to the roof frame support?(a section at a time of course). Maybe Ron has an idea?
Thanks
Gordon
Thanks
Gordon
Comment